Show ENGINEERS LEAVE ON VIADUCT TASK City Engineer J C Drown Brown and County Surveyor Walter S Craven left leU at noon today tolay for or Salt Lake to meet with engineers of ot the Union Pacific s tem y tem and anil review plans and specifications for Cor or the construction of ot the lh Twenty Twenty street viaduct extension rh The plans pl n have been prepared by the th rail railroad road engineers Mr Drown Brown Mr Craven and the railroad men rill Ill meet deet with mem memo members member bers ber Of ot the Iho state stab road commis commission to die dl cuss sion slon later In the afternoon cuss plans for or opening op bids bid for forthe forthe orth the construction and preparatory matters |