Show HIGH POWER LINE I SURVEY IS MADE RENO Nov Nev May H 14 For 14 For For the purpose of surveying the route to fo the high po potter er transmission line over the Sierra Nevada Ne from Drun Power Po a point connecting I nith Ith the lines hines of ot the Truckee Rh er Power company near the Ne ada lane the Pacific Gas and Electric I company has assembled a crew at Grass Valley and pr preliminary lIml- lIml nary nal 1 work ort is under way Stcl Ste towers of o exceptional strength t te withstand 1 the winter storms will he be ted When completed the line IIno haie ha a capacity ot of sixty thou thou- thousand thousand sand |