Show Uv NEW ENGINE ON PASSENGER RUN Assigned to Service Out of Ogden Og on ou Test Operation J tests of o the th new South South- Southern Southern em ern Pacific engine No In handling heavy eavY frel freight ht trains UP the tho Montello Nev hill bill where this one engine did tile the lh work done by two the th big biff locomotive bas been assigned to er service out of Ogden den tor for tests In Inthe Inthe the of ot passenger er trains This new engine enl lne was wa built at nt the tho Pacific shops In Sacra Sacra- Sacramento Sacramento mento The Th tests being made mad on the Salt Lake Lak division aro are watched with much Interest Interest- by railroad men I A new departure Is bin made bY v the th Southern Pacific In build build- In Inot In ot of o five fhe 8 2 S 4 mountain type tYle engines at the th Sacramento shops The beds for these locomotives are piece one construction This I Is a solid casting 62 52 feet Ceet S P Inches In length with maximum depth of four feet teet three and a half halt Inches and maximum wl width of o 10 foci The wel weight ht ot of tho the engine bed alone alonIs Is i pounds Each of these beds combines In one casting the usual main frames frame consisting of two 1 unit units one at each ellch side fid of ot the locomotive cross bracing and va- va va various t- t ious rious other parts of ot the entire un- un un of ot the locomotive |