Show I APPROPRIATE SUM FOR DAM SURVEY WASHINGTON March 26 28 The first step toward construction or of otha now new Coolidge darn dam across the Gila river riser canon near San Ran Carlos Canoe Arizona was wit taken to- to today to today day when 50 was wl made 1 avail available nil nil- able for tor UI cavos ves contracts contract and oth- oth other oth other er 1 preliminary work The Th project I Ih is h to Irrigate Pima Pirna Indian land lands a and other private ole and public land lands aI I The rho allotted today I I seats the first firt Item in an appio ot of for tho the fiscal sear ear nT 1 1926 26 The Tho sum um will be used to determine the tho total area r a to bo be em embraced in the tho project to 10 tip tip- ap appraise praise lands to bo be purchased by bythe the Iho government go to negotiate a basic contract with nIth the water users assocIation and to lIge arr for tor re- re relocation relocation r location of or the tho n Pacific railroad which now traverses avers the th reservoir sit lit |