Show 1 LIMITED AGAIN TO BE OPERATED trains between chicago and los ani geles will be put on april 28 according to an in associated press dispatch by paper the LosAn los angeles golos train will resume its regular ran rian on april 28 this information format iod Is s given out officially by the headquarters of the salt lake route and provides tor for the resumption of train seraf service cc two days earlier than had been heretofore announced this means that the track around the washout district will be in perfect shape by the date named ballasting and rebuilding has fias been going on for some time with the ordinary ger and freight service passing over the tracks but not mot until a thoroughly sound roadbed Was guaranteed could the fast fatt service of the limited train be resumed it may be said in connection with the condition of the track on the clark road that most of the freight tied ua up by the late washouts wa shouts has been placed on the main line and Is being moved east and west as rapidly as possible most of it being through freight the trains aro are moving right alone and ano tho the line will alts normal condition the train was put on earlier than at flroa scheduled so as to make it available for the low rates which go info into effect april 25 for the mystic Sh shrivers and oth other er conventions |