Show R IYE 1 6 aff t h WILL N 0 B 1 4 1 U N NORTH OGDEN CANAL CO AVOIDS HEAVY EXPENSE building a dam east of the Santari um bridges to be constructed ted that two bridges must of be built across ogden river has been in part decided by the action of the north ogden canal company whose workmen are engaged in malting a dam dain several hundred yards above the turn in the river at the mouth of the canyon rayon this will enable the company to obtain a regular stream of water during the summer which will in ill no wa way Y I 1 be affected by the course I 1 of tile river below the head of the tile canal it was thought that the irrl gadois depended so much on oil the changing of the stream that they contribute to the tile cost of repairing tho damage done dolie by the storm of several months a ago unless so t the unexpected happens before monday the committees of city councilmen councilmen appointed to provide ways and means for the improvement of the canyon dugway and the construction of bridges over ogden river alvor will commence work on the croc erection tion of two concrete arches over the old and tho the new channel of ogden divor the unexpected in this caso case la Is bids for the reconstruction of tho the battered disteel bridge two have been received one of 2290 th other of 1100 both aro are considered excessive by the council counell contractors may submit estimates until monday evening when decisive action will he ile taken |