Show important oil test delayed when casing collapses MOAL ba loe lo 10 turnip to das d at the utah veil vell situated dine nine mile miles south wt wet of iloan loab at it A oft lotic thie thin afternoon when the casing collapsed eolla pied seventy fire left feet above the bottom at 2 sose 09 16 feet toot thie this mishap whilo nu serious teri our w will 1 11 delay driving and testing of the well for tbt wo v c aks k fortunately neither bailer no 1111 ass wa in the hole so hat that a was wag saved thereby the etring string jt ff had jnet been droppel into tie hole hel bed A ol hek 4 s thy cable wary tle me that either the cement plug had rist 1 a or ahe cahng had collapsed when the bit was drawn from the hole A flake tit ot steel hanging from front the bit tom told that the rasing easing hail ol lapsed by py fun ain ding an plug in to th nola liole it ave fonna found that mat this hi wa wall th tondi tonai tn bjeld superintendent betchel tilted tl blytt t the cabine would be agel wg el tu t allow running a smaller tubing into the hole must be in the th ten anth easing the staller pip pipe run in aua thru thea demente a abich wall probably testing ot of the well about two weel weeks had the evident not occurred engineers ngi aas and representing r number of the lugt oil on corporations corporal lone in america fed feet fruent that the and send wound have been penetrated and suit tho the well avo proven en to be ail ah important producer |