Show EMERY ROAD IS NOW ACCEPTED the price finery road waa was accepted today by B W matteson and B J lynch of the federal bureau of roads they made a complete inspection in company with resident engineer E S 13 borgquist Borg quitt and highly complimented him on the way the work has been heen lone the most noti rable feature is the large number of splendid concrete bridges an I 1 the change in the old dugway by which it is made into a long eay easy grade of 6 per cent which can be negotiated by most moat cars on high this was ascom elishe I 1 by means of a 23 foot cut of feet and ft a 21 2 tool fool fill of 50 feet at least half a dozen timber bridges brid reg have been taken out by high water at drunkards wash and miller creek dur ing tog the past but no fear is 13 felt alt thit high water will ever affect the big nig eon con colte bridges tl TI bip bridges are a man monument u mont to C S 8 fisher state briage bri lae engineer A saving of was made to the state bv by Ing 1 inginger ineer bor quist in the grading an ant I 1 drainage the final estimate being while the nal estimate waa as 00 the total cost including the bridges ani ant material was wait A can fail now make the trip between price and castle bale dale with pounds b behind one pair of horses in ten tea hours houps bere it used to take 13 15 hours to haul truck trucks can make the trip much more quickly and the road will help develop the reio re oure ures cf of emery county in a rapid kanii oil rig tater i lal which could not have been taken over the old timber bridges has been curried c in with ease oer over the th ne tie road it will soon soan pay for |