Show CAR C AR SHORTAGE IS LIMITING OUTPUT oja I 1 cw COM mine mines of 1 11 val L reporting to the tile ait geological RC ge logical ur brier ter were handle appel for car cars during luring the week baled en led Sept ert er r 25 3 foi bleh the re to rort port waa was forwarded eat erda to wash ington L b carl A allou chief mine la tit ep ector sarte industrial commission ln mines re portel tor for that vec e the tile i Iro reduction reaching only 71 cent ot of normal three per cent of the tile lak lack wa was dud du to car short age 5 ier let cent wn was owing to mine atine dis dl ril and I 1 lee so than one half of 1 per tnt nu a chang charged led to labor tl cortage the tito car shortage nai sins more on some da una on oil other others one railroad 1 a over 50 let cent utah normal production let week meek it thi this time of year Is I 1 almost ton tons but tho Iro reduction tor for tho the to ertl ly I 1 y the laet last report wa was ton tons lour I 1 our mine mines in tie state dil di I 1 not report sir alien allen retorts that the outlook Is i good th ill market arliet ni for altah coal steady ani blat one new mine is 13 opening op enin that of the mutual cont coal company la in the eiring fit ring canyon district near rain rains L altah tali A food good sized crew ii is at work on ill U surface near the putting in and preparing for CA carrying trying on ott a general coal production pro luction A C watt watts wa was in the city mon aay on his hi way to salt lake from ide side lie ile had hoid lu bota rain alAs of the mino mine fire la in lik cap cabatit atit as clitte engineer of the tile utah fuel eim parly tit tt rattle Is in good and the work of opening it again Is I 1 nicely |