Show CANU CREEK OIL WELL i BEING PLACED ON PUMP the cane creek oil companas Comp anys well down the colorado river Is being placed on pump this week and manager william H heady expects ito to have it on oil production by next week A string of feet of 12 inch tubing and sucker rods lias has arnved ar ived in n moab and is beng toen down the river by boat boal transportation tran the well is bottomed at teet leet and drillers drillars dr illers report that is has been making considerable oil for some time it is believed there is cuni clent p production for a commercial well and it is the intention to 10 place ane well on pump lor for a considerable period to make an actual check on ori the flow sufficient is available at the location for a an n exten extended deol te test st |