Show Moffat Tunnel Report Received Salt SaIt Lake The Lake The size full-size railroad bore bora of the tile Moffat tunnel was percent percent per per- cent finished November 15 16 according lo to a report from the tunnel commission commission commis commis- sion received here Monday by hy Julian Bamberger president of the proposed salt Bait Lake Denver railroad from Crai Craig to Salt Lak Lake The railroad main are reported as per cent while the water tunnel aro are given as per pcr cent completed The size full-size railroad bore being driven from both sides of oC the mountain lacks feet of being heing finished finished finished fin fin- with the with the railroad r main headings only feet apart and the time water tunnel tun tun- nd nel headings 1808 feet Ceet apart |