Show work on the melville canal will now be pushed to its completion ion and it is calculated to to have the water running in iii it this fall so that there will anvill be no trouble about it next spring when people will want to bo irrigating the bi reservoir at tile the bovier bridge has been completed for some time past and it is claimed that if every reservoir above should break talis one would still bo be safe as there is a spillway through the solid rock to the north aher all flood batur con be sent around away from the dam |