Show flans REINO MADE TO BUILD LIBRARY the now new library ioard mt last monday oven evening lug ed th the library and ft was of er awed tile of tile laroo iti I ti public librae V for 1935 y ws nis atil and approved approve ap provo As AR nit attempt Is being made to lo build lil lil a albia library ry hall dIng under a project alnas for the vree rec lion of such a building were diff dl ans NO wa was made ow on account of s ahmo P ill 0 of the iw board oard members being bc ans absent and blue prints lit in the erection edon of uie library it at rt 84 george tila libri riall lind I 1 ere re gono gone over alid may with it a few cl cli unKei anges lio be used ito liori rp it Is thon phit a vree public mn n lo IO 10 bilidt nt at vin ahmo hmo with ali expense to ito tile coni con t bif if rock lock and lumpier nrc fire used vl all the file work on oil the til building would also ha be done by men employed 0 on n a project |