Show PROJECT APPROVED kanal will have hae a new cement sidewalk in ili the noar near future running front froin one side of tile the town to to the hie other ahn project piojo ct which calls for pede federal rat old aid of was apar approved akred lost wok in ili addition to the provided by adie 2360 2300 mill be obtain ed froan frain the state road commission BL beginning ut at tile west et edge of town the sidewalk will be constructed ted along tile the pa enst st side of the to to center street theia on oil talie north side of the street to the school grounds and from froin there on oil the eab eat side of tit alie street to the dilill edge of tile crift will be without lilly any expense to title aiho citizens of kanab |