| Show I MINING II I G MACHINERY I. ER ER Large Engine llIe to tu Be lie Installed at lit the tIle Daly laly al West JIMI Park City July 14 The H.-The The horse power Corliss engine that Is to be In Installed installed In- In stalled at the Dal Daly Daiy West rest mill to taI take the place of the small high speed engine en en- glue cine now In use has arrived ul The machinery will be delivered at once the Improved condition of th the canyon road admitting of heavy Y hauling to the mine One section of the fly ny wheel Is en en route toda today with 24 4 horses attached It will probably ze take lake about three days to reach the mill as the grade crude i hI te and alid the lie distance about two 1 miles s. s s |