Show STRUCTURAL STEEL FOR MISSION THEATER ARRIVES Five carloads of structural steel stcl to tobe tobe tobe be used In the new Mission theater building being erected on Third South between Main and State streets arrived yesterday morning Work on the tile steel frame of ot the tho building will be rushed as fast as possible The Tho structure willbe will trill willbe be six Mix stories high an and will ho bo modern In ever every respect At present two shifts of ot thirty five men each ench are working night and 1111 da day in an attempt to rush the tile building to completion earl early In tho tile tilea tall fall a If |