| Show TINTIC STANDARD HAS SHAFT THROUGH TO Tho The now shaft at the Tintic Standard mine was yesterday holed th through ou h between the WO and ane Ic els levels sinkIng sink sink- Ing Ing and amI raising raining from those levels Ic having haying hay hav ing Sn been In pro progress ress at tho the same came time Only feet teet of or timbering remains to tobe tolie lie be done to complete the shaft to the foot level le el Tho The work wak thus far tar done dono lia lies lias been heen accomplished In two months with considerable time lime lost on account of oC other work worl Interfering The new now machinery Is being placed in position and It I Is expected that It will wi be bo ready to go Into commission lon the tho JO timbering Is corn com CO- CO i jl tei rt wl then ten pu Hed r to the to-the the foot toot level le el and drifts will willbe wi be lie run to get under the oro ore and near- near oro showings et In the thu two bl big veins |