Show SILVER SHED SHIELD TO BULD BUILD 60 TON MILl MILL I Large Tonnage Is Opened by Raise From Tunnel Level Level I I Preparations arc being made matJe by I Manager Iann er Harry S. S S Joseph to start work upon the foundations of or the new concentrating concentrating con con- conI I mill mi to be built buit b by the Silver Shield Mining company compan near the mouth of the tho Niagara tunnel The rhe mill mi is to be of or 60 tons a day a capacity Tests of ot tho the Silver Shield ore made by IW the General Gen Gen- eral oral Engineering company compan w w that three and a half hal tons of ot the ore will wil be bc converted Into one Oc ton of or concentrates concentrates concen concen- making a product carrying values values val val- ues 01 of ot 35 per lead lend 16 ounces of ot silver siver 15 li per cent copper and in gold goold A largo large tonnage of milling miling ore has been opened b by the thc raise which has been driven on the vein from tho tue tunnel tunnel tunnel tun tun- nel level le el to a paint point between the and levels Tho The raise h has s about aboul feet further urther to go to rech the thc surface and a ventilating system Is now being installed to ena enable le the mana management to complete completo the work With the raise pushed through the thc mine will vill wil bo be von ven I so that work worl in the ore oe can be prosecuted at greatly greaty lessoned lessened expense |