Show PARK CITY WATER I FRANCHISE IN DOUBT DOUBT Park City March 10 UI-AL UI Av th the meeting held last council which was wa 01 oJ 1 tho the city business pertaining to night important franchise was WIlS brou brought ht up tho the water 1 general manager or of Bamberger V Water ater r tho the Park Parl City Light Heat I company said ila If the company were wele repair the franchise It H would granted if the council would not ask I 1 I the system their control Ho Ito V for things beyond Light that tho the Park lark City alHO alSO state stated mud did not notown own the tho company Water Vater Heat until It was In tn their reservoirs water be impossible to ton n In- In Increase 1 I. I und nd that it would amount of water the crease of the Lockhart secretary stated that the reservoirs had ha company them over since tho time c enough water in that the reason water was wasso wasso last lire and was because the that lla day so scarce pumping the water I King fIng Coalition was vas workings Tho mountain to Lu LIV itS V over ver tho thio tunnel which Is owned by the tIme Alliance furnishes the water to Coalition V Ring King Heat J at Water Vator Park City Light Ii ht the taken Is being Much interest V company ns the Coalition has also matter as this V In lit franchise water V applied for a arrived and has Time The city lire map mal this will bo ho of conS considerable Importance franchise water In granting tho time engineer i It is to be engaged engaged en- en A hydraulic the city council what to advise to have havo a n good water would be required will bt be City Action cHon V Park lark It system stem In water franchise e as as soon goon goonas taken on the possible V as |