Show I GREAT T DREDGE ON WAY VAY TO COLORADO RIVER Eldorado Canyon Placer to Be Worked on Large Scale I Searchlight Dec Dee 10 Apparently Apparently the promoters promoter or of tho the dredging proposition proposition Prove Prove- at the tile mouth of or Eldorado can canyon on arc are fast closing up Uj tho the minor details and anil will wIlt Soon oon be ready to start actual ope operation ra ti on Local freighters have had an opportunity 1 of oC bidding for the tho hauling or of the plant hut but according to tho the latest report the consignment will go in via Kingman Kingman King King- ing- ing man and Chloride Ariz Arise and Loving Withers of or the former place will get the contract The he outfit will comprise tons tans the tile largest piece a boiler boller weighing pounds Most of or the heavy timbers will swill come came In foot 0 lengths It Is said that the contract stipulates delivery within 60 days The Tho promoters declare thai that 1 If the first t dredger dredge Is a 0 success at least three e more will be speedily added In order to secure the exclusive rights along the Colorado river it was necessary for tor tho the company compan to contract for four foul dredgers gerli costing The Tho company Is reported to have GOO GOO- 1000 In Its treasury |