| Show INVITATIONS s FOR FR PROPOSALS TO c executive surveys Notice No 19 13 Department of or time the Interior Office o of U. U S S. Surveyor Surveyor General Dis- Dis DistrIct District of ot Utah Salt Lake Lako City January 1 12 1909 Notice is hereby given gl cn that sealed proposals will win be bo received at this office up to and Ind Including February J 10 1909 for or running measuring and ond markIns marking mark mark- ing Ins according to Iz law and instructions Instruction the following full ul and fractional townships townships townships town town- ships viz In Kane lano County Count Tp Ti 43 S. S SO Rs Us 7 7 8 8 and 9 W. W Tp 4 4 1 S. S Us Re 7 7 8 and 9 W. W V. V Tp 42 and 41 S. S R. R s. s 9 W. W arid ond ondI I Tp 40 S. S R. R 9 W. W In tn Washington ton CountI Coun Coun- ty tI Tp 41 S. S RB Ha ni 11 1 I 12 12 and 15 W. W Tp 43 S. S n Its Rs 9 91 10 11 11 1 12 12 13 18 IS 1 14 11 lG 15 and 16 W W. Tp 42 S. S RE Rs ii 11 1 12 12 and ond 13 W. W Tn In Garfield County Tp 31 3 1 S. S 5 Its Rs Is 7 and 8 S E. E an and Tp 32 S. S Its Rs 7 and 3 S E. E Iron County Count Tp 32 S. S R. R 14 W. W Tp 34 a S. S R Re n 1 12 and IS 18 W. W W. W R Tp 1 S Rs Is 13 1 14 l- 15 IG 17 IS 18 19 and 20 W. W and Tp 36 S. S It R. R 16 lb W. W y v. ri The Th estimated number num num- ber of or miles Included In above townships townships town town- ships Is Is section lines 1574 standard lines 10 lQ Meridian Guide lines 20 O and nd township lines 0 also probable recur recur- vets veys or In same townships townships town town- ships section lines 10 standard lines 42 Gul Guide e Meridian lines hines 18 and townshIp township township town town- ship lines The Tho above surveys are arc of or the Salt Sal Lake Lako Base Baso and Meridian Utah Uth It I Is Ie probable that most roost of ot tho the lands embrace In tho the above named townships are mountainous In character charac- charac charac charac- ter All Al corners of or both surveys and resurveys will wi be bo by tu tubular tubular tubular tu- tu bular Iron Iran posts filled with wih cement and surmounted by riveted brass caps which will wi be substituted for tho the wooden wood wood- en on or stono stone corners heretofore used Tho They will wi be delivered free tree of ot cost to the surveyor sur at the the railroad station nearest to his contract or to any railroad railroad rail rail- road station staton preferred by him The TIme posts are aro o of three sizes 3 2 and 1 r I An average avera o prairie township without meanders or closing closinG corners wi will require 7 72 1 Inch 26 25 2 Inch 1 12 1 Inch 3 posts pasts The one-inch one post 1 Is 1 to tobe be bc jc driven the remaining posts arc are fan Hanged flanged at bottom and anti required to be bc besot sot ot In el excavated holes hoies about C G ani and S 5 Inches In diameter two tV feet Ceet deep The posts will wi be hauled and delivered along the he line lne b by the tho deputy nt ot his hlf own ex expense expense ex- ex pense pence which should be Included In his n or bid No 0 separate bids bils for tor mauling Rn and planting the tho posts will wm be he The brass caps are arc to be marled mark mark- marl ed d by tho timo deputy with wih steel dies or munches to IndIcate tho the location The design of post and required markings or each class closs may bo seen at the L. L office of oC the tho surveyor or general genera general H or OL UL posts re 5 lbs Ibs for tor smaller size 13 lbs Ibs for tor medium and IS iS' Ibs lbs for tOI lar largest est alzo which does docs not Include tho the cement filling the estimate weight of which is 10 lbs Ibs tbs for the largest size 5 S 11 llis s. s for medium and two Ibs lbs for tor Ils smallest size The total weight of or tho filled posts for tor each eli township Is 1302 1 02 Ibs lbs fled The posts are arc furnished hilled filled Samples of at tho the posts and of ot tho the dl dies dicu t with which to marl mark the brass caps cps may maybo mayhe mayho bo ho wih soon at the office of at tho U. U S S. S S Survey Survey- General Deputies Deputes will wil furnish t own lies dies Bids must mUt bo be at stated prices Bils per ier mile les for each aud nil all 1 of ot the classes of or survey enumerated above and ncr ni nC will be bc considered where bid mileage o m the tIme prices exceed for standard nn and aud meander lines for or township and for fol section and connecting connecting- lines Unes except where the lines of or survey pass passover Jnes over mountainous lands or lands heavy- heavy lly ily ly timbered or o cred co covered with denso dense uno un un- I and amid In such cases a at uie umu u of 1300 aie for tor standard anti and meander rate rato lines 1100 10 for tor township and for section lOO and connective lines Jnes except oven tho lines lids of et survey ass Where hero tn In heavily mountainous land lands or ur lands lunds timbered or covered with dens donse undergrowth undergrowth under under- exceptionally wih difficult to and growth and In such Buch cases at the rate survey Hurc and meander mcander 2500 for fur standard of or 2500 lines 2300 for tor township lines and linen lino 2000 for section and connecting mile or part of or a mile mie per mile for tor over every port 1 mie and marked n-marked In the tho field eld act JI actually run mileage In excess of the tho minimum mini mini- Rates of or and SOO for the tho mum mUll described lines will bo be of ot tho the wil survey stipulations allowed only un under er statutory and character of class clas the tho as to tons lands Bids must state sIc specific tho the lands each class clasa of ot surveys maximum maxi maximum rates for but intermediate and minimum shou mum should d not state the tho number lumer rates of In Tu miles mie the tho at tho the respective VI IH I. I HOPS t. t not that a a. event bid make a consider that he can con above quoted a within the tho statutory rates sum lump-sum diem or he ho may mY make matto a per include all and bid These hese bids must al preparation of every ory o expense including and a per diem and field eld notes a plats plat specifically the exact bid must state for field work and number of days different dif dif- Indicate a dt- dt notes the tho field should actually employed employed em em- days number of or doys brent ferent lumber establishing the tho lines payment payment pay pay- In iii lne time bo ho made according to the ment mont to mode but In no notes field il stated In tho the feW total exceed the tho rate bid or on tho the case to will be No allowance amount bid td to or from the time going made for tar If only onh 1310 office work for or time for far I field or lump sum bid Is re received 10 no- no one per diem or If It will not be considered I wi of oC tho the accepted bid exceeds amount tho the contract tho this for apart or the sum sum Bum set palt mileage will be reduced by y the W I n ml o of or time tho of some sonio tion ton diem or lump sum Bunt bid bide e reduced eced ced per pel proportionally Is the Limo largest a Q awarded to will iii ho he that contract wil and 11 OOOO to a urn firm single surveyor Inthe in with the understanding of ot surveyors time the latter case casti wih that work vork bo be to completed com later surveying season and In one erie contract of the signers on tho the all that al All bids must be bo ma made o ent ut r the field Al feld in iii writing scaled and marked Proposals Proposals Pro 11 surveys execute ex cuto government to dated Januar January January Jan Jan- In notice No 19 described 1909 All proposals to execute exe uary 12 Al tho the surveys must t be Lie accompanied cute ru five Ove b by a a. a cent certified of the chock check estimated representing liability of ot per nor the contract to be awarded Where the curvey sur cur survey liability of ot tho proposed estimated vey Is and over tho the Certified be bid will to accompany tho the wi check amount will vill b bo the time and that wi maximum amount of tho time check re 10 ro- ro I The check will be bo retained b by bythe bythe the surveyor general until notified b by bythe bythe land office that tho contract contract con con- general the the tho tract has been awarded whon checks will be returned to tho the unsuccessful wU bidders Tho The check o of tho the successful suc sue bidder will be retained until tho wi have been properly Cot foi ma ms of at contract ha e executed Proposals may bo left at this office oce in person of oi In iii an nn envelope and forwarded by mall mail mal Bids Bis for surveys described in this notice will be opened on February 11 1 1909 and wU notice forwarded lo to the tho successful success- success ful eul bidder within 30 0 days dayo thereafter accompanied with contract including bond which must said surveys and be properly executed and returned to thi this office Immediately Only jOnly respond respond- ble reliable and nd competent surveyors will be employed who mu must t execute their wil l surveys In person and an will wi be re required lt ro- ro to give bun bund bond in double tho lImo estimated est est- esti mated amount of contract In each In In- In stance Persons who have not heretofore heretofore heretofore hereto hereto- I fore executed a agricultural contracts In Inthis I this state will he required to furnish satisfactory wt evidence o a as aN to their tech tech- I I c and ability to curry carry cry same caine ameto to a successful completion It I will wi bo be required that th the surveys tur eys herein do- do described de scribed b be completed and pd returns made modo to this office On ori or before December 31 a lt 10 1909 09 Surveyors Sur ma may submit bids bid tinder under un tin- der niece more than one notice but tine bids must mim be bo separate under each In bidding bid bid- ding cling on the townships embraced in inthis inthis Inthis this advertisement deputies must not bid on scattered i townships but bul on contiguous or adjacent townships which may bo bu formed into separate groups or contracts This This office will wil limit e each ch deputy to such IC I un oil amount mount of ot work as us cc bo be properly completed within the thO time timo specified The right Is reserved by this thin office to reject any and all aU bids bids- and nd no contracts will wl bu Lv binding on tho part par of ot the United States until approved by tho time commissioner commis ston r 01 of th thu general land office THO THOMAS HULL nUIL U. U l. l S. S Surveyor Sur Col General for tor Utah |