Show STEPTOE SMELTER READY BEADY THIS MONTH First Unit Will Wi Take Ores April Apri 20 O and ad Mines of Ely Are 4 1 Read Ready Ready y y- y 4 1 unit uni ot of the tho Steptoe concentrator concert concen win will wil bo ho l ly ready i to take lae nn of or on the Oth of or- or this thI mo month il ol It will wll e. e b be able oble to handle 1300 tons tons tons' and better dally possibly The announcement ment of or tho the Oth JIB as 08 the tho date on which the concentrator will avill bo ready to start was made following following fol fol- fol wIl lowing a test ot or tho great rent engine in inthe I tho the power pr house which will wil furnish tho the power necessary for the operation ot of th the first unit unit With the execution lon of or some belting beling which Is yot yet to arrive everything Is cady In the first fut unit uni of the concentrator concentrator concen concen- for operation with wih the exception which are arc minor details tion of ot some somo ton ami be bo rapidly lY being concluded can disposed of or In almost as a quick time as Os mn may he bo necessary On the tho ore lino rapid progress ro rss Is with the surfacing be beyond beyond be be- being made wih yond Copper Flat and there thoro is dent expression made mad of ot belief belef th that t I Ithe tent the road rood will wi be bo ready to answer tio the concentrator for oro ore on call of r the the Oth Oth At Copper Flat things are fast shaping for production and there thero from la is little doubt that ore can como the steam shovel sho el operations I by the Cumberland Ely Oth The Veteran of to ship at that time and ready will bo be wll send the first ore oro through h the Ute may concentrator that It I will wil h have to han hai dle ilic 1 Pointer shaft of or Nevada evada The Sl Star r e with Consolidated Is also welt well wel advanced d I and It ItIn ItI to shipping work worl preparatory there rush orders l I In probable thai thaL will wi prepare it Cor or bushings by the o lb I understood that S. S W. W is S manager It I of or the thc Guggenheim mining be hereon hereon here hereon interests will reduction wi and witness the tite beginning the to of on concentrator operations operations- V. B. B others Thompson Is also expected and in connection with vit of or prominence Consolidated Consoli Cumberland I Ely h and Nevada dated may be along from rom the Ute r. r East Est 1 is Js expected that i It Within two ds days it working fourS four the new fout- fout Veteran will lre break breakthrough k shaft shan of or tho the wi level leel Into the he lower tunnel through after having been sunk approximately surface This was wag from the thc GO COO COO feet Gallagher Galla Galia- Jack the thc statement of or Foreman Gala Gala- evening camoIn carnein last Insl gher glier who overestimated is the time cr 0 It Is possible stated as ns tho the mated Mr Nr 11 Gallagher Galgher next nett roun round of ot holes ma may the thc through the thin crust from tram separating the ol old When Then big new working besides ho be little completed there will will wIl be bo needed lUle before the shaft which wi can comm commence nc EtY Ely production ore 4 White WhitePine pine PIno News |