| Show WATER IN NEW RESERVOIR MACHINERY WELL WILL tuesday tho the fir first firt t test was made of tho the pumps and motors which are to be used in filling and supplying tho the now new city reservoir and anti to say that the equipment came fully up to the expectations of the cita cit authorities would not bo be too strong a statement many miny of the city officials wont to tho the reservoir to view tho the test the switch was thrown the motor began to hum and an instant later a great stream of water car Ci ining ring seven hundred gallons per minute was thrown into tho the big pit from the tile supply pipe all day long tho the machinery was kept in operation and by nightfall night fall everyone who had hail witnessed the work declared himself sati satisfied fied it is the intention of the authorities tic i to fid the reservoir allow it to soule foi fut a few days diaan awa the water refill it and then about the first of next week connect it with the water system the reservoir which has a capacity of three million gallons was built at a total cost of about it is claimed for it that besides putting water into the cemetery and watering a tract of over three hundred acres belonging to the city and which will eventually be bo divided into parks and residence lots it will furnish pure water for domestic use and a greater pressure for firefighting purposes |