Show S nUU nU MEASURED E I Contains Tons TOi of Ore Oro Running 1 Well eU In Copper The Tho Ruth nuth dump of or the Nevada Consolidated Con Con- d company at Ely has been mf measured and found Coun to lo con tam tain 40 ton of oC ore Th The Ruth and tho the Star Pointer workings have hn boon been connected b by a through which all al th tho Nevada NevadaS Nevada S Consolidated Ruth ores ore will cill wl bo le 10 conveyed conveyed con con- to the Star Pointer shaft Bhat The two shafts are aro a a considerable distance apart being located one on each Bide side of the mountain and in sending the tunnel from rein both shafts to meet at ati i the point of ot connection the two workS worlIn work work- S In logs Inc s varied from rota each other less than 5 I quarter one of an In inch h. h I It I Is the plan of oC tho the management therefore to lo drive under tho the Hull Huth dump lump and to break It down so as ns to carr carry the same via the main working tunnel to the our four Star Pointer shaft shan The tonnage on th the dump thump represents the time results of pure Nevada Consolidated development dc work tork anti and it I is popularly considered red I to average vcr very clo close close- o to 2 1 2 1 per cent cen cop copper per |