Show SILVER SHIELD SHIEL IS DOING GOOn GOOD WORK ORF Completion of Double Compartment Com Corn t Shaft Shaf Will Wil EfI Effect Ef Ef- Ef I Great Saving CUTS TWO LIME BELTS I Indications on Level Are Aie for Extensive Ore Deposits I While hie little Ile Is being J-ald J about ft H. work of nf considerable Importance Is under a way li in il time the JH propertY properly of the Sliver Silver Sh Shield ld Mining company at t fling Bing- ham On the Niagara tunnel level le two tio t o narrow lime linie belts have been heel cut at nt a a ort vertical l depth of feet feet Both Bothof of th these e conform in strike and amid 11 dip iii with wih the great ent lod lode 1010 upon which time thc mines mineR of f the tho United States the time Utah Consolidated and the time BIngham companies com com- panics paniCs are situated They are on nn a mi i lower stratum and al aro c mineralized wherever el found to ha have been broken bm i h y th time the cross fissures and ond as the time property prop plOp t oFt erty rt is known to have numerous intersecting inter Inter- f fissures at the time surface a nil all of ff f these must at some ome point below lelow the thc surface be found clog crossing ln the time lime Iliac beds eds an and I at mit such ch points are arc sure to tobe tobe be le found extensive deposits of oC ore ome The Time company is now no supplying its is own air und and power and amil Is working ata at ata a minimum cost but lut the time works are mc reached through time tho Niagara tunnel which f i Is nearl nearly one arid and ard ono half miles In n len length th so that lint progress is both slow lou slow and expensive The Time situation in InthIs thIs his re regard can cn bo ho improved ed only by hy bythe hythe the he completion of nt the time double compart- compart meat lent shaft haC which has been leen started the he work worl hein being done domme from rom time the tunnel tunnel tun tun- nel net level Ic upward Time The shaft haf will wi reach each the lower lowel level of tho the Shields Shield's evel upper workings at ut BOO foot feet and amid will wi reach each the time surface aL about 9 0 feet Cun fu Tap fill Fl uro Ea I At any n point throughout the time len length th of this sha shaft a crosscut ros cut of oC IO loss lees M than timan 50 SO feet will wi tap tarl tIme the SI Silver I Shield fissure in which er very high grade gaona ralena ga- ga ra- ra lena ona was left for 00 feet In the time hot hot- toni tom om of the upper workings s when the time pump had hal to be taJ taken cn out When completed time the shaft haft will wf fa- fa development on a large scale as as It will wf pass pas directly t through both he time fissures and the lime beds bed already proven pro anti amI known to contain richand richand rich and extensive deposits of or sulphides es and will wm relieve the company compan of or the of or operating through a a. long bug tunnel which passes through h property other than baum its own |