Show WORK WORl STARTED ON WILD CAT CANYON CANTON ROADWork ROAD ROADWork Work has been started starred on a road contract con in the Wild WildCat WildCat Cat canyon area North of ot Beaver Blaver I that will eliminate the worst piece on road on highway 91 This Tins will be bea i ia a great Improvement in the highway high high- highway high I way and should add materially to its It use as a through route JOute The project starts just south tf tl d the horse shoe bend in Wild Cat canyon and continues to the top of the bile summit south of Cove Fort all the winding r road ad through the canyon for that dis dis- tance The horse shoe bend will be eliminated by a cut nearly feet fee deep and a large fill flU al at the root Foot of ot the Incline The turns In the canyon be beyond ond are eliminated by bj moving the highway farther west Two contracts have hav been let one oneto oneto oneto to Flo Floyd S. S Whiting of Kaysville for the grading an one to the Dodge Construction Co of Nevada for the graveling and oiling |