| Show MORE DROUTH RELIEF PROJECTS APPROVED Three more drouth relief projects for Iron county were ere approved during the week II by the Governors Governor's drouth re relief relief re- re lief Ud committee authorizing an expenditure expendi expendi- ture ture- of at an additional Two Taro of at the projects are considered to be of particular importance since they are to protect the culinary wa- wa er supply In the towns effected Summa Sum Sum- mi ma and Newcastle Newcastle gets ts 2000 for tor a culinary water ater pipe line Investigation by state engineers reveal that Newcastle Is losIng losing losing los los- ing about 60 percent of its Us water between between be be- tween the mouth of the canyon and the town to through canal seepage etc The project approved Includes the piping g of this water Summit gets for a culinary water ater pipe line which Is considered t tan an even greater necessity than the project at Newcastle The Reservoir and Irrigation Irrigation tion company gets 2000 for an irrigation irrl br- gallon gation pump well A project for Hurricane was also ap approved approved approved ap- ap proved during the week which ap appropriates appropriates ap- ap for the replace of the Hurricane pipe line Une |