Show Suspension Bridge I Over Coal Creek Young Ogden aiden of or Richfield was waslow waslow waslow low bidder on the construction of oC the bridge over Coal Coat Creek in Cedar can can- yon you The company company's bid was Engineers Engineer's estimates of the cost cast of or the bridge was placed at The bids were ere opened in the Ogden office of or B. B F. F Finch district engineer I Ifor roads for th the federal bureau of oC public Six bids were received receive and the next lowest bids were ere A. A E. E Salt Lake City and Ora Bundy Ogden The bridge which is to apa span span 1 the creek ot of the entrance of the canyon on the east side of town Is to be a cement and steel reinforced construction construction construe tion with a foot 73 span Weather permitting work should start about the middle of oC January |