| Show rive F for or P. P 0 O. Site oney ioney Nearly Finished 0 I Calls for Deeds and Topographical lap Map of Property Property Both to be Mailed I f Monday I Construction Scheduled I I J. J to Commence Within Sixty Sixty Days e drive for the necessary to to toj lete payment on the federal build build- te Is nearly completed Last night amount secured by notes taken the business firms individuals and city totaled and the ce ice of 1000 00 Is assured to ig from two or three that had to place the matter bethe bethe bethe be- be the directors and several citizens I at present are out of the city but expressed themselves before leave leavit leav- leav it t e they would gladly contribute ds the amount necessary for the letlon of the payment of the pur pur- price of the site rd has come to the Chamber of erce from the postal department ashington D. D C. C requesting that leeds Beds to the property be sent Im tely the the government ying for the property being ready g over to the L. L D S. S church postal tal authorities have also rea re- re a topographical map of the showing the exact size loca- loca of ot the pine trees that surround it ce e from the street curb line dine ie of the property all of which for the use of the archi arch t teet t In determining the spot forthe forthe for forthe the building to stand and the necessary necessary necessary sary excavations to be made for the basement and foundation of the ture Information has also been given the Chamber of Commerce that It Is the desire of the government to commence actual construction within sixty days and to do this It Is absolutely mandatory mandatory mandatory manda manda- tory that the government have the deeds and the topographical map within within within with with- in a few days das so that architects can cant get gat t to work on the plans and complete them in time to allow of the government government government govern govern- ment publishing a call for bids sufficiently sufficiently long enough before the sixty days have elapsed It Is understood that the Chamber Chamberis is giving proper security to the church that the balance of the will be forthcoming In notes and that the church will be guaranteed against loss lossIn lossIn lossIn In the collection Upon this guarantee which Is being prepared today the church will ill release the deeds and they will be forwarded to Washington Monday Monday Monday Mon Mon- day and should reach headquarters by Thursday of the coming week |