Show Looking Over I Rights Rights- Way Rights f- f fW W ay Yesterday Commissioner E. E E E. Wiliams Wil- Wil llama iams and Surveyor Hillman Dalley Dailey looked over the ground on which way of rights oC must be secured for Cor the proposed new road grade from Cedar north tw two or three miles mUes The new grade from the cemetery around the knoll ll north of town and for a short distance the other side of the knoll encroaches farm property owned by by- Cedar residents It Is this property that the state and county de desIres desires desires de- de sires to secure way right-of-way upon be- be fort for the construction of the highway commences It Is expected that no trouble or de delay delay delay de- de lay will be encountered and that the way right will wUl be secured within a 0 avery avery very short time immediately after which actual construction work will commence District Road Commissioner Osborn rn states that in all probability work will commence by the middle of March or first of April Bids tot tor for construction will soon be called for |