Show Power Tic Tie Line Completed to The tie line that has been under conot construction between the Telluride Power Company's system at Beaver Deaver Canyon Canon and Dixie Power Company's Company s sub-station sub in the Parowan Bottoms was completed last Saturday With this tie line completed Southern Utah is now well protected against an any serious power outage Telluride Power Pow Pow- er Company having two large hydroelectric hydro hydro- electric plants in Beaver Canyon and Dixie buying surplus power from plant to together ether with their ir own three hydro electric plants two of which are ure now backed by storage reservoirs and 2 SOO 00 h h. h p p. gasoline substation sub at engine reserves at the Cedar Cit City certainly should hould prevent any serious power outage front from now on This combined power system willbe will willbe be attractive to industries coming in into into into in- in to this country countr as it assures them continuous service and southern Utah is indeed fortunate in having such a connected system as it is well known that any anyone one single plant cannot give ive proper and adequate service lot In |