OCR Text |
Show tiie uiiiiK niMMi;.n:i. Km mors An' Uniting I lie llrsiTUiir Site anil Hit1 lines fiir the flatus. Il.ivid .lames. ex-Supt. of the Salt Lake water works, and Mr. Forlier, Chief Engineer of Ogden, are now out south of town measuring measur-ing the water in the canyon above Three Mile ('reek and locating a riser voir and the water mains from tin1 reservoir to town. It has been fully deeided to secure the supply for the water works from the Three Mile Creek canyon. Work to that end has conseUently been commenced. com-menced. The work on the reservoir reser-voir and trenches will be started as soon as spring breaks, and the en-lire en-lire system will be completed from ")() lo i'0 days after the first shovel of dirt Is turned. |