OCR Text |
Show r FOR SCHOOL GYM: Tb'e contracts were letj Tuesday Jht the meotlng of. the '.local school board for the erection of the new gymnasium. The work of erecting erect-ing this building will commence at once, as the building Is to be completed complet-ed in 125 days according to the contract. con-tract. Paul Poulaon received the contract (for the general work at 127,000.00; and M. S. Lett recolved the contract (for the plumbing aad beating at B,oeo.oe. " Tbere were tour bids for .the general gener-al contract made by S. W. Farrer, Roudlne-Chytrans, Chlpman Mercantile Mercant-ile and Paul Poulsoa. The bid of Chlpman Mere, was second lowest being for $27,888.00. For the plumbing aad heating three liids were presented, M. B. Lott, H. B. Cramer and Darrel Brown. M. 8. Lott presonted .the lowest bid which was just 1125.00 lower than tbat of Darrel Brown. The building is to be situated on the school grounds where the present supply room,' or old manual training building stands. This building wilt be torn down and the .materials used In the erection of the now building. The new structure Is to bo 62 feet wide and 145 foet long. It will have .a stago suitable for dramatic and 'musical entertainments 22 x 22 feet I On each side of this will be dressing I rooms and storage rooms for the I chairs and gymnasium equipment. 'A large maple-floor will bo laid In tho gymnasium proper which will be suitable for'" basket ball games and dances. A Are "proof motion picture room wll) b'o' built In tbo building. The plaal call for a balcony to go all around the building and two wings containing skower baths,, toilets, etc. i These will aef'Wp'laced at present however, a funds will saot permit: .1 . o -. - .- |