| OCR Text |
Show CANNING PLANT IS THOROUGHLY MODERN When Operating at Capacity Will Employ 75 or 80 PeopleWill Peo-pleWill Be Ready For Beans in Three Weeks. The Pleasant Grove Canning factory is rapidly being shaped shap-ed into condition for the opening op-ening campaign which1 will commence on beans in about three weeks from date. Manager Man-ager Miner is authority that the plant will be in condition for business before the fanners fann-ers are ready for it. This week a section of the cement floor has been taken np and replaced with four foot piers, to which the floor is strengthened with steel reinforcements. rein-forcements. This was necessary neces-sary to support the heavy machinery ma-chinery used in packing. Five new peeling tables that will accomodate (30 girls have been completed. The 15 men who will be necessary when tho plant is at full blast will make a total of 7f) employees and even this number may have to be increased when tho bean and tomato seasons are over la) each other. The plant ilslf is second t none in the state for doing ' work for which it is intended, but Mr. Miner says that a storage warehouse is badly need to make the plant complete. com-plete. A feature about the plant is the ladies room for changing clothes and for toilet purposes. Rvery thing is connected up with water. There is also a modern lavatory, for in, the Pleasant Grove plant compliance compli-ance with every sanitary condition con-dition will be a loading feature. fea-ture. The new artesian well is now flowing about 100 gallons per minute and will save the work of two men and a team in carving carv-ing away the refuse down the gutters and into the lake. |