Show zima zuma shaft down to 1300 4 drifting will soon start A couple more rounds will take the zuma company s shaft to its I 1 objective point the 1300 level and then drifting will he be the next thing in order although some time will be lost in cutting a station manager pennell and other officers of the company are of the opinion that sut suf focient depth has now been attained attal nd nd and that a campaign of prospecting on the 1300 level will result in the opening of an ore deposit the large break which was cut by the shaft several weeks ago has almost everyl every I 1 indication of ore and it is said that the shaft at its present depth ap pears to be approaching another im fissure |