Show 29 November AN 1873 IMMENSE MINERAL On Wednesday City ly the Galena and Southern situated Canyon above Bingham in the by owned & Carson ’ smelters therefore hereafter mines the prior in wo side of the to given mile from partially tained tain by by clining By at this the of the close to most easterly short the ravine distance The at vated of by access the ers from on which from in situated mineral other the from being connected two the the Jordan the with the the to buildings are are also the of main the calling extent The surface this of tons of the blast place of and the not high built hundred The the which with not if the on portant One over of in deposit which on made is in all Computations times by tunity mine Some they extremely low bulk revealed The 1430 feet and the eight needed is so run to as all which the works dumped conveyed them In to remarked of “It the while it” miue no worth drop makes used as by ing and of done 280 and of to of consist of in furnaces these $900 of cupolas the A & B C R of the front the the open shaft from hill struck of found that taken that that and this been make the of must it turn be of of Such two ounces silver others from a latter now the sixteen similar being being ore fifty and is to $50 mine the fifty lead sil ounces of value assay sixty to cent per the shipped differs twelve centage per in ore ore of from feet linear The parts going cutting carbonate of various of amount 3620 The company’s gross lead of the value West At ated a where point it crosses not nearly bluff U S city from R and R the river the fifteen east and we the courtesy the for mine their facility in tical information mine and that of Captain mining the and getting of a side the the com and of about B C The ed a A Binglmtn Jordan our of ton in the mine mine The B C track passes between making collection Statuettes Steel embraces Engravings a line of Chromes and entail tubercular condition or except— Scribner’ exist ing long the pools be oil in J of the The reported be unction a he and returned existence of oil of what of vicinity' will who employ the full coal that his in bottles to Salt an convinced fully and he large spoou two pronounced of in test expert coal and petroleum dipped up with as of qualities tho and analogist been Companies From lo coal llalsman Mr time the to that practical a a yesterday by City Oil Coal believed is Iron T result in few a 21sf gives at foot many present of arises ly large and castings various lessee alive making Success to prepara the to be to foot and eighteen to and in sight thirty lead Lake in the to there equal is The Rough company’s tunnel a iuchos from been has vicinity struck being are of prospects of lodge thicknes iu tho tons ounces taken Other mines in worked with good enter a from twenty'-five cent varying galena more aud property' per more of cut the another of and Ready' by mines is being developed A feet which is in forty-seven purposes is been much step thirty-five sixty-five have of one being ac in taken is it tho on certainly mine twenty a assaying and as is of report are each shows hundred one silver ton informed and shaft ore favorable Pierson ledgo of Stockton at properties developed which mines which The Co’s There estab Co’ A exceedingly Stockton an improving Sprague A first superintendent Adams Sprague value the at as M F Mr E the so succoss Herald IN CRACKS crack all dry the clay they the exceedingly not an dwelling drying iu to employing by become walls are off dwell avoid by finished a care or seasoned rock the in studs that builder in a sawdust ous matter into the mules on their own The and mine is one worked as now if when-in hands private xvoods aro plastic form paying list property California of — M S if’ Press ted iu Franco heated jected to the to tons acquires the ceeding A dure) sawdust alone inven sub and of 609 pressure thus and it and hardness ex foot compactness a terrnel temperature square wood of that product recently of enormous Fic moulds been with made cement mixture the by formed bullock’s blood also high to in ob their mixing other or shape is a by pressing woods have mixing sawdust and compressing durable wood (hois and imitated glue with and desired the M M to if a By of wire to east be shows sand joists when to the calculate Trevk that steel flic resisting steel fracture steel forces also of find traverses that coil a of cooling ’ingot a when perfectly cold a is eum-nt magnetized Chedeville electricity surrounds tho on and of current to before can crush $13621 and the waste at time paid them ton per fifty up$S opened of mill a road at as fine length space sharp atoned mills ought to be a splendid and add another to tlie dividend paying mines the of width and first the to promise great year crush of tons yielded When have out $100 mill fifty-two last wagon sorted A will particular sufficient s outside joints is the across using and clean thoroughly Walls Walls the foot the tho at corner-posts lather of crack extra unless finished at to tlie at thoroughly every allowing plastered room entirely plastered hand the lath ‘ ton of product paid $23 one run they cleaned since per they good a Certain ten fall joists and rooms have the at the crack to unless joint $160 August tained seasoned liable of studs liable taken per In or $257 per ton rock was packed mor to aro is corners the the country’ ton or iu since lower year a This District of so the is and joints studs of or most the the titious framed of extend lieu and careful $230 board mine county Banner time some the prepar such of a usage a upper break of always are in honestly is where in of crumble inmates com build in 000 Diego of exception tons mine of cellar it made a which the plastering will if for is of a ive San on Chariot the mine without 100 of and up dug employ wails If studs at the corners before the walls are also usually crack R side loam is that made is crack also are on sandy the they junction both the District since then mortar among mortar the just it d is 100 clean unless a ed dries the the of that banner is tons about interstices sand lath for the before of the of pro walls the It is weather professional and not When a drying in half rough large mortar fill of hot excavation are tho to lime riddle are is material grains shrink lathing Low there the made is Banner is listed stocks new week ive frame receives is made of mortar mingled with sand the tho ing the mortar as to employed in the practice to attributable materials the from crack always the Among this mortar or which good not and and to that Parian elegant oil it opening have lathing liable do Art distribution to nounces a grand Fine at the Pioneer Art Gallery take place some and der direct who work the dwelling-houses the tar Charles photographer tho air fine of class no is made was vhere tively works and causes in defect it statis is in and which sufficient until PREVENT of lathing Savage The TO of 1 per necessities at readers of scourge community solid corners advertisement the to of con stove without business the the ing mortar clean sand smelters attention Wilkes dwelling-house affording with in hand since for machinery bo privilege connected an from iu equally time for demand the to we correct die are same annu render stag breathfouled atmos hindering its replace direful visit ten are we accordingly interests for tho currents dose from the to notwithstand on employed this tions an with said state for other busy no future is The on from from will now these frequently which are of miles miles with time and ers adduced mine have we At of been mon they one connected are than more to Jordan the works be the analysis days— Ogden impor Lake Salt and them laid on very brick wall iu firm a that can keep to men will at angle situated junction twelve junction a right are on the overlooking a river Jordan that of every works enough between in made is have if whereas sharp and $05 by aud earnest believe of present the stagnation present January are river inde this iu work orders that the When mortar sand among which portion of aluminous works their indicates manager A Carson Buzzo us situ Railroad Canyon at works manding the forms question in mile of it Bingham settlement in conclusion of the work are outlay as the strongly these smelters a small banks the on the Jordan as evidences they if In and some purpose purchase outlay an men best all points Walls various calculation total a times to trom WALLS been Jordan least land business that the the tight the at general will the to a the the direct making $15000 of from canal cost indebted done We seen attention our work of will which may capacity of amount to before water means mean ex adequate an convey of distant HOW cost also for con which out of 1900 win and is where stinted from Salt company has surveyed miners prising forty buildings the at received firm will the Our uninteresting that know Nevada yards the close to this to by site water bringing such is we by completed which and up 000 order ore immense the realized therefore to the and mine of description Any fail conception be shipments 7000 addition purchased A pendent men ever in stoping to heavy would give necessity no resort lias part taken sold bed done of use case 50(10 the the has for Eastern men weeks half when of erected asser solid a done not may to from in a Smelting as been a The is about in land of This it works what Tho of differ padded opened never living iu chambers effectively Lake mineral machine be Works heavy Major and city and it in a out We three $30000 acres by extensive through made and immense previous a about on not extra lately cutting to alluded tons with the A of are already nant phere affairs of contract this the to and Testing knowledge in and of directly exclude with the S deposited by flues in of the U either grading and furnaces These by The of has about being orders house done Evans excavating tunnels run Galena of proof that to the company the and isted to thousand the in has To by Chicago that ever to taken notwithstanding etc tion been & of is remembered and being a mine the done necessary smelted a the has of be been at quality parts will has ore than drifts ore It stoping of other to depth no pound other in ore surface superior of in the furnace easily return is together the are these per along receptacles stack ward ore incline from be out less main feet to The in tioned dis in be respective smoke our readers from mason by Morris in grade thick the 113 also a feet of level foot their city lishment run coming coals can work leading highest the eleven bottom at of and lines shipped made grade consisted and vein a forty been low thick feet the cutting covering depth six to be reverberatory ore so these unnec was of the with will lines $4000 of concludes that consumption iu Vienna Fetersburgh violuh power growing and death-rates doctor ventilated home the foundry of this ing a easy have wall a R at charcoal of costs connecting track of used be purpose instead which the saving can that ton per expense since coal as for attained in of the retained can the him and being are to along 0f by immense visit tho the which dows disease motives indicative for one the is the sub from paper even certain injured double-glazed ing and pencil in effect these remove degeneration prevalence bo traced ment bodies of organic to seriously is of ten be to furnaces test occur other capitals cality who other or tance be most the are ent the coal As to ores slaging expense ton been has to weeks through five drifting cross with galena in with of below bed portions some of actual feet 830 feet solid a value ore figures represent workings aggregate above terspersed 1 thou the from ore into reported three cutting tion sight explorations the by tunneling the through lp of after about much saving these iu in foreign blasting and object so electro or Territory those as car inches if and contaminated with that tubercle After reviewing of of middle the the in partitions Two pres a of end part by reverberatory inspecting Making ver in undoubtedly estimate The made “strike” Works wonderful these as essary the oppor an drilling thereby bulk various at renders and divided The fuel expen mining center houses ore Ubing cost or either at ore characteristic mentioning which encountered truthfully rock ligious be sumption Iu this capital double doors and windows interstice being every carefully with dosed doth wadded or and seek inter an come astonish them equally ns will he much the be now furna compartments treatment Gau quite Another that is substance is it dump to three storing by Mr mine will should reduc the pellet tho for of been becomes coal this The view at slips on our told Nolely cubic power body detaitus never matter ago of to tho mortality the belief to Foster the two while Mr reverberatory with its for always not of over wealth obvious with St ponderable names stretch feet nine already gas and al as by of accounted be Years cupolas still hundred in reading manipulating mind of summit six course placed be house into of and fact nothing costs shaft raise to the this ores building ports shipping the of The its of caused already is has which or twelve tho air is inexplicable are proof movement writing hardly phe the furnishing mind of air breathed by either animals or human ings The hourly elimination of bonic acid by tho lungs to stoves Foster’s time day at of sometimes utmost bluff foundation acquainted all to are ces is this the the be similar foundation the dissipated is the which of period of and by consumption of tho London that consumption on MaeConnao by breathing may etc Mr remain baffled theory while 1 nearly' mind biology are through cais a will The built but accepted to susceptible without of which much ordinary It likely is as being of Br kin expressions unless bo scientests lution slag the to and general that is indefinite the a side level in ent reverberatory on the the on at of (lie hand upper iuto noticing foreman a the not tunnels shafts the from do two The tion little we than works ore that indeed tap are is more the noticea of built the erected house for reason those contain to be are to lower by are for differ it sciences tho work new Henry a sequently jirecipitous this works new out the of side ablest visitors ‘incomprehensible’ fact an the come away physical both ascribing some to agree for thereby to years to impressed electro-biology in own nomena the dumping bias remailutble tho that true explanation nliicli by side for for below feet river room being is thick fourteen features furnaces while its north the building mine locators than mine the on of have dislodged less principal windlasses sive the above feet of unexplainable The rises it as bed on waste that excavated as such other The thirty ample on have the been no working im are hundred a interior of that was ore at than more this through appear day in had Extravagant tons may an made it of inexhaustible have much world’s locations been estimating sand these who liow to as resting fact have going of the probability those smelters still are reveal action extensive purpose selected water-washed bounded bluff tracing to is affording is who of score have remember the view a the large tunneling prospect a seeiug the the the cause ‘wonderful’ com of all come seances is studs sound theorv is maintained tubercular disease or lost is religious witnessed It others all These ’ the dred one already are to It rock means length formation adapted probably of and bear The level it one Jordan property this and day one tons workings more surface they as in interior each to devil connected is in through from persons Foster’s mental as draft flues stack been furna by in feet and the as blow which anil amounts all genuineness manifestations ns long so sharp a injury CONSUMPTION In stances furna of and Mr the with feet inch contrary crack never joists continue extra ‘humbug’ of endure without will but an occurs evidence will that hammer a in not awakened of irrespective from The furnaces natural has it reverber erection stack arched the well is abruptly pass silver locators to as in galena much around means of occupation the six The fifty and pleted bluff on covered two when foundation a reverberatory feet drifts of deposit hole’ this yet long brick tho that of with question curiosity cry pressure classes of sixty-three is feet deep the im stack ‘tho not but but been has which The agency idle proves phenomena iu curries reverberatory tlie three a of with by suppose and ‘gopher jumpers has thousands its position On the of a his ore to that tho tlie of in This walls on lias Spain? repeatedly incident furna ounce of tone eleven four course smoke feet with in the with Foster?’ asked out works reception and been HOUSEI week past war seen two cupolas six lias you WALKER the be there manner ordinary interest an of and the two together inclines and to and as and and drifting locusts drift the for it The mine those from it useful commerce and and layer feet awaiting pick prepare more a 1000 taken dislodge to on has thin open thousands which miner’s in worked a of remain still feet underground large been are linear a 110 is as very have ore by distance from we has removing by a a run of in ore such which well as for vein been feet vein exposed loam for property 7100 width of mine entire of been its delivers canyon Galena The the works the for with of consist already ces that portion will furnaces one supplies and new ‘have by from half and The cu one smelted mine will been on blower with Jordan ton completed atory is silver ounces after the step every led vast of done out at shafts one through One while and revealed tunnels carbonates chet ore receive side be outside smelt made to Galena the of property aro ravine the trans the this shipments of easy are with con to to There connected dumps miue the Jordan the are from and turn day per taken ces the foity over mineral almost hoisting readily employed to ble left of will it dumps ore teams the ore on would a back the iu shelf reached is the Something ele and ascends of candle the be in the description property the that seen port round along the road on Galena the this the and is ing or more visible bullion bullion ten ore built engine works These power The appearance horizontal P works two Hoot one The deposit of and II of is ces the one of the as but canyon point of From location the of clustered situated and hill light the hand slightly farther hill which right the is side sequently in is the from initial westerly be of mine its of great curve mine on side Jordan the Galena bodies been winds road original The the the of depth a thirty extent the The the less furnaces blast any much three plan is imagined of The furnished explora From surface aaiount in back the a tlio have construction 109 STILL AT THE The question of in those old patented the be as com of and pola of block until ing against side around canyon and stream makes and huge from hill degrees forms defined sugar half that correctly descend ob moun of forty-five seen the be convex circular projection bed is be being hill est will of loaf The ‘ shelf and a value ' walls its by cannot mense bot with made attempt to as reached open and Works Mackenzie’s gold demand hundred probable consist fifty river full the one useless the cuttings company’s increased meet course tons employed Jordan of GAZETTE a dividers of one of the idea a the angle half probably may with an it better laying surface descends at pair of bed to other splitting and lengthwise be resources the ship hundred the Galena old Mackenzie of ore are be the a outlay one of on to therefore of the of it as unacquainted those scenery flat A hill down the top huge a hill the out each opened of form in the at representing tom or stream point distant The profit day of been tions north summit spreading canyon a the the the running ravine mine’s yet to the viz: per would gross net an men will works es a a the fifty works made tons of side Canyon from side ridge from a fifty of one the forms that small a is from spurs Bingham by either on main situated is mountain formed is shipments the at completion force putation HILL mine the main ern the the moderate we yielding while from smelting amount have Thirty the it $2500000 month day the very worked is per pending of of company new when the tons $3000000 per It ponderous many the to at 100000 of tons the it value put we and Thus ton per if sight of average one believe ore ments the as call of timate location which the report and JORDAN On of that seen in are will speak this being it We sake property same mine Galena Jordan be will transportation $23 are Galena the manipulation The $3000 Messrs also are brevity for and other mining of cost mine miles mines company West at mines three each as the Bingham Both same to These about to Buzzo Bingham Ilill City proximity close and mines and train visit a Jordan on main and on Jordan Lake Salt morning o'clock The DEPOSIT left we Railroads Canyon are last seven Utah the via THE UTAH MINING finer not hud extension grain than passed loss and Tim power compression of |