Show NEW ORE NOW BEING IN STANDARD drifts on the 1300 and also on sub level above encounter a good grade of ore truck troubles cut down output it seems that almost every new piece of work that Is started in the property of the standard min ing company results in the opening of 0 new ore this was tire alre case on the 1300 where a couple ot of drifts were sent out toward the northeast along the strike of the ore and also on the sub level about sixty feet above where similar prospecting has been under way supt bupt jonn john has had three or tour fo new headings under way on these thes two levels as well as a raise abolt an it Is understood that they are now w all in pe ore shipments from fro the stan dard have beers been s somewhat ehat lighter than usual during dur h the past two weeks but this ignot not the fault of the mine by any means as the ore la to piled up in large quantities both in the ore house and underground the motor trucks have been having more than their share of trouble and this accounts for a slight falling oft off in the shipments the transportation ot of the standard standards s ore between the mine and the loading station on the rio grande ry Is quite a problem and right now the lower end of the road Is in rather bad shape making minor break downs very common A road force Is being kept continual ly at work however and it will be but a short time until the trucks are able to move the regular tonnage of ore each week manager of the standard who has been enjoying an extended vacation Is expected back from southern california within the next few days |