Show zuma resumes sinking down feet I 1 manager P J fennell says that sinking Is once more in progress in the from the level of the zuma mine in th the e ea eastern a aern I 1 end of 0 the district the rece ent n t changes in th machinery w will ill e enable ilea a ae t the company to proceed much rapidly with the development ol 01 f the he property just now the is down a dis tance ot of feet and the ore show ing at that point justifies the belief ahat that greater depth Is all that the company needs to bring the property into line as a regular shipper in sinking this one shipment of ore was taken out |