Show Repairing Damage caused by slide sime everything will be in readiness for the resumption of work in the victoria shaft early in the coming week by the first firs t of the coming week everything will probably be in shape for the resumption ot of work through r the shaft ot of the victoria mining co it will be remembered that the sur face workings or kings at this property were considerably damaged by a snow elide slide which took place more than a month ago and it has taken longer than at first anticipated to repair the damage done by the slide supt bupt william owens says that when he put a force to work clearing up tl 0 ar wreckage caused by the slide alide be he found the boilers and some of the other machinery covered with fully twenty five feet of snow this has lias all been removed and carpenters are now busy repairing the tile damaged building laithe ore which the victoria mine Is producing la Is all being demov ed through the eagle blue bell shaft the properties being connected on various levels the shaft of the victoria company Is needed tor for the development work mork which the chief cons people are doing in behalf ot of the company comp anys s property this work Is being handled at a depth of 1200 feet the contract for driving the drift over into the hav hay ing been awarded to walter fitch jr who Is handling work of the same me character in half a dozen dif ferent local mines this dritt drift had not been carried forward tar far enough to reach the holdings until it cut through a very promising bunch of ore which later will be min ed by the victoria people and nat aurally there seems to be a splendid chance of finding something in piu pin IDS territory plautus Is 1 now controlled by the chief cons company and later the property may possible become a part of the chief although plans for the consolidation have not been worked out |