Show the iron blossom makes copper ore from north end be sent to 1700 level and then to the surface through no 1 workings woi kings of the property it is thought blat tl at the connection between the 1700 level and the birze through which the iron blos son soma ropper copper deposit las been de aill ill be made today and with the completion of this connect tion heavier shipments will no doubt be in order at this property prop arty this connection means tl at the tile ore from the north end of the iron blossom and particularly the copper product can an be sent down to the 1700 leitl and then taken to the surface by way of the mine mines 9 no 1 shaft aich abich Is splendidly equipped and in shape to bar hardle die a very large tonnage of ore it was aa more than a year alo u that the iron blossom arst took up this piece of development work which resulted in the tile opening of a big de posit of copper ore in the north end of the property this work was handled through a from the leyel level and while the copper ore was opened ed on three or four levels only a small amount of the ore I 1 aa as been placed on the market the man argement preferring to wait until it t could be handled handled to better bette addan tage that ti time MI has now w doze come and next week neek we wa wn a expect pe a larger tonnage of ore aiom from ex ws a mine an I 1 included in this bonnage will be a considerable quantity at copi copper fhe work of connecting the north and south workings pf the iron blos som at a depth feet has re quiren many months time and the expenditure of a large sum of money but such a connection will be of great benefit in future operations ALI in the first place it was necessary to drive a drift many hundreds of feet in length on the 1700 level thia this work having been handled in record breaking time by walter fitch jr mine contractor and then there was the sinking and raising necessary to connect with the upper workings |