Show shipment of zinc from standard east tintic gintic property will forward carload of zinc ore to smelter early in the coming week min mined ed from 1200 1 level on saturday the teams mill con mence hailing a shipment ot of zinc ore f ro ron roa a the cintio standard mine to the railroad thit this is tac first zinc t to bg mined at this property ani rill bupt join states that it was taken croaa the 1230 level where there is a very air oho shoving ving of this character of 0 ore she illo work mork dolo in taking out thia thie eh all i ment ho he ever shows ehg t tw fai zinc ore df dr posit is making below the level levo and tor for that reason the management mill i the shipment ot of the th a class ot of ore until a later date an fin I 1 go alter after the ore which can I 1 1 mined without putting the vot don do in to greater depth the shipment of zinc en ort which will leave the mine within the next few days wu will contain about 15 3 ona the ore carrying better thin than 33 i 1 r cent c e n t z zinc c this orp or seema seems to conne come under u n d e r ru the he lead ore home some lead ore is now broken flown down at the tintic gintic standard and following the christmas shut down S apt wt a mil keep a corple co aple of 0 men busy in mining in n g th a p product ro duct on the tire 1260 level m where he e datts s are re being sent 0 it toward the ear and west seat Ar another rOther piece 0 of borit will be bg raShed along aa as ats s 1 bt e oa on the t level I 1 aher her ua adrift ift is being a s nt toward tard the tait mr bir states thit that so far this month but one or tu two 0 shifts hav ha VL been lost on account of the bad air stormy weather always makes it difficult for the tintic gintic standard people to keep the lower workings of the mine free from bad air aut ut the big tan fall is kept going day and n blowing the I 1 aure are air into the in nine no through a sixteen inch pile there has been some talk of driving a raise through to the surface fiort fro a one ont of I 1 che he lower levels or sinking a new I 1 shaft in order odder that the mint may be properly ventilated but this will hot not be taken up until after the ore bodies have been more opened and the property laced on a pa ing basis |