Show saving product for new mill dragon people have decided to discontinue shipment of the lower grade ore which can be profitably treated in new mill at the dragon cons property the mm min ng rag of low grade ore reached from the long tunnel which was driven over toward the line divid as ng this property from the iron blossom has been suspended this class ot of ore was worth only from 12 to 15 per ton and the management dec der ded that it would be advisable to hold it until the completion of th new plant of the tintic gintic milling co at S 8 1 ver city with the mill in success ful operation it will be possible for the company to realize a larger am aunt of money on th a class ot at ore the suspends on of mining op rat ona ons on th s low grade ore deposit resul ted in the laying off of a portion of the dragon force work will bo be continued in the ex north end of the comp company anys a ground where drifts have been sent ever over into the dragon from the iron blossom workings and the dragon people will also continue the devel work on the level in the south end of their ground the drift on the level of the drag dragon on shaft is now fol following loing the vein matter a combination of fale talc iron and manga nese and the showing could hardly be more prom s ng another piece of work b has as been started in behall of the dragon corn com pany a drift being sent out into this property from the level of the iron blossom th a drift will pros hect a very likely looking part of the dragon ground at a depth wh ch should be ample to reach the corn com in mercial ore |