Show george Syd linker will drive tunnel at baltimore mine george linker n k er of 0 this city has has taken a contract for forty feet of tunnel jye work ork at the property of the baltimore mining ining company the contract was vas let early in the week the price being 0 o 75 per foot and the mory mill will betaken ip thy nex net lov few d days s the haiti balt mor ground is located in the east era ern era end 0 of the district some distance fo to thi th I 1 no of the tintic gintic standard in a nice boly ot of ore ly encountered while the work which aich is to b done this win ter teia is in the vitur of assessment on the claims there 13 a possie li it y of the work being contin aed if it the showing in the main in un tun nel justifies this |