Show cyanide plant will be erected at the may day for handling dump ore arrangements are now under way may for the erection of a small mill ng plant at th may day property where there is a tail ings dump containing about 60 tons of lov lo 10 v grade material which it is thought can be sue cess tully fully treated under th s tern tem A cyanide pant p ant of some I 1 what limited limit fed capacity w m 11 first be constructed and th n if th re is a satisfactory prof profit e in the t his treatment of the or ethis pant p ant will mill be enlarged the old may I 1 day y 7 in 11 made a very good savings f values and consequently the tailings dump doe not contain adyth ng big the values are in gold and silver with some lead and th profit in handling the ore by the cyan ide process will probably not ex aeed twenty cents per ton |