Show improvement at tintic gintic central supt bupt thoma thomas s ho he daway states that the drift upon the 95 level of the tintic gintic central pi is no being driven torwald at the rate of about eight feet each daa da two sl gifts being employed upon this work within the past few dabs da s there has been an improvement in the formation thio thi Ligh which the drift is passing same some black manganese quartz and other miner rock appearing in the lime an assay ir ry ade several days ago show ed some gold silver and lead but not enough to make the bioc of alue however the showing is highly latib factory |