Show cutting 6 ul ring out station j over at the property of the tintic gintic mining development company bupt james fitzgerald is now work ing a force of about twenty men and tonight 0 n g lit the machine drills will start catin cutting g out a station in one of the crosscuts from the main tunnel it tg is at kt this point that the new hoisting plant is to be located the distance from the portal of the tunnel being something like 2700 feet mr fitz g gerald erald estimates that it will lequire it little better than tu two ci weeks to finish the station work and then the sinking of a new shaft will stait im mediately the new hoisting engine an be installed while work is going il on in the shaft all the outside work the erection of buildings etc has been practically completed at this property pio perty and no time willbo will be lostin lost in proceeding with the campaign of de elo work which has been out ai lined ned |