Show power line completed telluride pov pon er can now be used at the tintic gintic smelter it C don carlos of the telluride Tel lunde potter company states that the article in a recent issue of the herald to the effect that the tintic gintic smelter was waiting upon his company for power is not the line to the smelter was entirely con plated three da q ago and the power compan company could lave turned on the power be fore tl ti is if the tile smelter had been ready to receive it there hasteen has been some little delay in completing the transformer plant at the smelter and this is the reason that the smelter has not been able to use the telluride Tel lunde power the transformers at the smelter are being installed by the smelting company and naturally the local representatives representative i of the telluride Tel lunde pow power er company do not care to have it appear that the them have delayed the timing turning on of the juice when then thell part of the worl has already been ali aishe I 1 |