Show first ore to reach the new smelter eleven carloads car loada of ore from the sih sili er shield mine at bingham is now at the ne v smelter having ar 1 rived the early part of the present week this is the first ore to reach the new plait plant and it would have been held back for a week or ten days had it not been for a misunderstanding W lester mangum manager of the smelter who was at the plant on wednesday says that the silver shield company was notified a short time ago that a couple of carloads of ore which was loaded at that time would be talen care of at the smelter this order was misunderstood and the balver shield company sent eleven 1 1 I 1 carloads of ore form fora ard mr mangum states that he will have no trouble in taking care of this ore during the short period which will elapse before the sampler is in operation at the smelter weather and other things over which the management had no con tre arol I 1 have delayed work at the smelter somewhat but the plant should be ready for operation about the f arst of july the new smelter will be buy y ing and receiving ore within two weeks perhaps a little sooner 4 |