Show MORE HIGH SCHOOL I 1 M PROVE E the board of education at a recent meeting authorized a number of needed improvements at the high school some of which were detailed in last weeks news the write up did not cover the entire ground however tor for a running track around the gym was included in the budget also the completion of the ladies physical culture training room to ri clude shower baths and closed quarters the running track in the gym will bs be used aso gallery purposes when basket ball games ar art 3 rt rheed Eed which will overcome the jammed condition of the floor such as maintained last winter an exit to the outside will also be provided from the running track to admit spectators in and out without vit hout going down into the basement the last item of improvement and which will doubtless be taken under consideration at a not distant date is the completion of the plunge or swimming pool off tile the gym the funds ot or the school board will hardly admit or oc this room being completed other than the closing in of the girs girls room ant and boys shower bath with a swimming swim mins basin completed the high school will be fully equipped down stairs to supply all the requirements of a first grade big school |