Show ail A mm EXCELLENT ROAD MAO the resurfacing of the state road between willard and hot springs Is now being accomplished as fast as the force employed thereon can do the work and the manner of 0 constructing the road bears all the ear marks ot of being the right method the crushed rock which the convicts put on the road and which were firmly rolled into the road bed and then ce dented together with sand have been pretty much worn loose and they are first swept oft off to give a perfect and hard bed then a coat of 0 is applied with a coat of sand on oil top of it crushed rock is then applied about two inches or more thick with another coat of 0 and sand the completed part ot of the road is hard and fast at this early date atter after being put down and the claim is made that time hardens liar dens tile the material wonderfully so that the road should be even harder after a while I the crushed rock for the job is being 1 prepared by the weber county crusher at the rocky point at pleasant view just a shot sho t distance from the springs and the big weber county steam roller is 13 pressing the material fl amly into the and then packing ng |